Major Closures Expected Today for City Cycling Event and CBD Infrastructure Works

Sunday Traffic Overview
Commuters and residents across Brisbane should prepare for significant travel disruptions today, Sunday, 22 March 2026. A combination of a major city-wide cycling event, heavy vehicle infrastructure works, and planned road closures in the Central Business District will impact travel times throughout the afternoon. Authorities are recommending that travelers allow for at least 30 to 45 minutes of additional travel time, particularly when crossing the river or navigating the inner-city reach.
Major Cycling Event Road Closures
The most widespread disruptions today are caused by a large-scale cycling event. Extensive road closures are currently in place across several key suburbs, including South Brisbane, Kangaroo Point, Auchenflower, and Toowong. Affected motorists should note that the following major thoroughfares are subject to full or partial closures until late this afternoon:
- South Brisbane: Grey Street, Melbourne Street, and Vulture Street are experiencing rolling closures to facilitate the race course.
- Western Suburbs: Heavy restrictions are in place on Milton Road and Mt Coot-Tha Road, with diversions funneling traffic toward Coronation Drive.
- Kangaroo Point: Main Street and surrounding local roads near the Story Bridge are seeing intermittent stoppages.
CBD Crane Works and Eagle Street Closure
In the heart of the city, major infrastructure maintenance continues to block through-access on the eastern edge of the CBD. Eagle Street remains fully closed between Charlotte Street and Market Street to accommodate heavy crane operations. This closure is scheduled to remain in effect until 5:00 AM Monday morning. A contra-flow arrangement is currently operating on Market Street between Mary and Charlotte Streets. Traffic controllers are on-site to assist, but drivers are urged to avoid the Eagle Street pier precinct where possible.
Motorway and Arterial Alerts
Outside of the city center, the Logan Motorway is the primary point of concern for highway commuters. The eastbound on-ramp from Boundary Road and Skepper Street at Ellen Grove is completely closed today for planned roadworks. This closure will persist until early Monday morning. Motorists are being diverted further east to the next available entry point, which may cause congestion during the peak Sunday afternoon return period.
Public Transport and Rail Updates
On the rail network, while most lines are operating on a standard Sunday timetable, there is increased activity on the Shorncliffe line due to ongoing digital signalling system testing. No major track closures are affecting the inner-city lines today, but passengers should remain aware that bus replacement services are active in localized zones where Cross River Rail supporting works are being finalized. Translink advises all passengers to check their journey planner before heading to the station, as minor timetable adjustments are in effect to accommodate the increased pedestrian traffic from the cycling event.

GumFest, Organic Markets, and World-Class Theatre in Brisbane Today

Science, Sheeran, and South Bank: Your Brisbane Sunday Briefing

Public Notice: Essential Road Closures and Health Advisories for Sunday, 22 March 2026
